Skip to content

Concept redesignfictional company, placeholder content

Obsidra home

Resin surface systems for industrial floors

Obsidra

Surface intelligence

A six-part resin system, specified as one assembly and installed by a single crew. One accountable surface.

The science of surface.The art of application.

Material Chemistry

High-solids resin systems that bond into the concrete itself, so the floor and the slab behave as one material under load.

Engineered To Last

  • Bonds into the slab, so it cannot peel or lift at the edges.

    Premium Chemistry

  • Resists cracking under heavy machinery and vehicle traffic.

    Extreme Durability

  • Resists harsh industrial chemicals, oils, acids, and stains.

    Chemical Shield

  • Cures rapidly to minimise operational downtime and business disruption.

    Rapid-Cure System

  • Low-VOC, low-odour formula safe for all indoor spaces.

    Eco-Conscious Formula

  • Seamless high-gloss solids, multi-colour flakes, and marbled metallics.

    Custom Aesthetics

Lab-Proven Durability

Three stress tests, run on the finished assembly rather than the resin alone

Impact resistance

The resin matrix spreads compressive force sideways through the broadcast layer, so a dropped load bruises the surface instead of fracturing it.

Specified for design. Built for load.

A finish that reads as considered material rather than protective coating — matched to a spec sheet, and to the room it sits in.

Heavy duty, back in service fast

Cure windows are scheduled around your shifts, so bays reopen in sequence instead of the whole floor going dark at once.

One assembly, one warranty.

Primer, barrier, base, broadcast and topcoat come from one system, so nothing about the build-up is left to interpretation on site.

SubstrateSolutions

A vapour barrier seals the slab before any decorative layer goes down, so rising damp never reaches the resin and lifts it away from the concrete.

Now Available

Prime 01 — Primer — resin surface finish

Prime 01 — Primer

The anchor layer. Ground into an opened slab, it fills the pore structure and gives every layer above it something mechanical to hold on to.

View

Four visits. One surface.

Step

Surface Preparation

The slab is diamond-ground until the pore structure is open and every repair is flush. Nothing above this layer can correct what happens here.

Installation

Bring us a slab, a load case and a shift pattern.

Product

Order the system by layer, for your own crew to install.

Purchase product
Back to hub